🔎︎InfoisInfo

R Ranson & Son Builders Ltd
Builders in London

📞Show phone number
Remember you found this company at Infoisinfo' '

Address

9 Cheyne Avenue, Snaresbrook E18 2DP, London, Greater London.
📍 Show map


Are you the owner or manager of this company?



What you should know about R Ranson & Son Builders Ltd

Builders in London, Floor in London, Insulation in London, Fire in London

The new floor elements must have adequate support and should be sized and spaced according to the spans involved. This window should be readily accessible, large enough to escape through and close enough to eaves level to aid rescue from an external source. The new room(s) should, where the new and existing staircases are not fully enclosed with fire doors to all rooms, have an openable window or roof light provided for escape and rescue purposes. Escape in case of fire The principal route of escape is provided by the staircase, which must discharge to a suitable final exit, normally a front or rear door. Suitable guarding and handrails must be provided to the stairs and adequate headroom maintained, usually measured at 2m vertically above the flight. Spiral staircases, fixed ladders and alternating tread stairs are considered in special circumstances, however only where there is insufficient space to accommodate a standard stair. The stairs The preferred access to the new room should be via a traditional straight flight of stairs with landing top and bottom. If the dormer is close to an adjoining property it will be necessary to provide additional fire protection to this element from both inside and outside. In the case of the walls to a dormer window it will be necessary to ensure they are suitably weatherproofed and insulated. Generally any existing glazing contained in the walls of the stairway enclosure must be replaced by fire resistant glass. Depending on the layout, the new doors will have to be fire doors or in some cases existing doors âfitted withâ self-closing devices. Fire resistance of the walls, both new and existing, is again of major importance and expert advice will again be needed. A full structural appraisal by an appropriately qualified professional is therefore recommended. This new element of const The walls The new floor must be supported by load bearing walls adequate to carry the new loads and must have a suitable foundation. A dd

Social networks

We don't have any social media account of this company

Other users also viewed:

Reviews of R Ranson & Son Builders Ltd (0)

Your rating of the company
0/1000

Do you own a business?
We help you grow it

Get more clients, visibility and branding.
Let us help you achieve your targets and improve your business.

Add your company